Australian-basedCapability statementWorking with GroundMapContact
GROUNDMAPGeospatial

Queens Domain, Hobart · bare earth by slope, 2 m and 10 m contours · Showcase

Industries

Mining and resources

Exploration to closure, surface and underground.

Terrain, volumes and underground models for exploration, operations and closure, processed and corrected in-house from your surveys, earlier surveys of the site and new capture flown to our specification. Each survey is aligned to the last, every volume carries the confidence behind it, and our Principal Geologist reviews mining and exploration deliverables so they read the way your geology and planning teams will use them.

  • 98.7 % · where two or more scans overlap, each scan within 1 cm of the shared surface · El Teniente
Registration agreement between scans, not absolute accuracy against control.
UNDERGROUNDLooking along a production drift at El Teniente, cable tray and services under the roof: the fused laser model in true colour from the robot's camera, white where no scan measured
El Teniente, Chile · inside a production drift of the world's largest underground copper mine: one model fused from 44 laser scans registered without GPS
El Teniente underground study Showcase: GroundMap processing of public survey data. Survey data: Chilean underground mine dataset, Advanced Mining Technology Center (AMTC), Universidad de Chile (Leung et al., IJRR 2017; CC BY-NC-ND 3.0 CL). Processing: GroundMap. No affiliation with the mine operator or the dataset authors.

What we deliver

01

Exploration terrain

Bare earth under vegetation for structure, access and drainage.

02

Pit, dump and stockpile volumes

Month-end pit, dump and stockpile volumes from repeat capture, cut and fill, with the confidence behind every number.

03

Underground and voids

Drives, stopes and voids scanned by mobile and SLAM LiDAR.

04

Geotechnical monitoring

Wall, slope and subsidence movement between captures, graded against survey error.

05

Tailings and water

Dam, catchment and storage terrain for capacity and freeboard.

06

Closure and rehabilitation

Landform against the closure design, back to the earliest survey.

Talk to us

Start a
project.

Tell us the site and the deadline. A pilot on your own data under a written pilot agreement, before any paid engagement.